FAQs - Quote Accepted
Once your quote has been accepted, understanding the next steps is essential for a smooth and efficient installation of your Pool Void Cover®. Our FAQs provide clear guidance on what we need from you, including approved pool and house plans, site contact details and information about scaffolding or site access.
We cover common questions about preparing your site, coordinating with builders, confirming handover dates, and ensuring drive up access to the pool area. By reviewing these details, you’ll know exactly what to provide and how to prepare your site for a safe and efficient installation.
At Safe Pool Solutions, we are committed to transparency and ensuring our clients are fully informed. Following these steps will help you make confident, well-informed decisions and ensure a trouble-free installation process.
자주 묻는 질문
Next Steps After Your Quote is Accepted
Once your quote is accepted, the following timeline and requirements apply:
- Site Inspection:
- Existing Pools: Arranged within 7 days of quote acceptance
- New Pools: Arranged within 7 days of pool completion
- Urgent Jobs: Exceptions may be made
- Follow Up: Any issues or queries from the site inspection are actioned within 1 business day.
- Job Preparation: Please allow upto 2 business days from site measure up to installation for planning and operations.
- Payment: Full cleared payment is required at least 7 business days before installation.
- Day of Installation Requirements:
- Drive up access for 4WD vehicle and if required, a trailer.
- Clear access from unloading point to pool area.
- No other trades working in the pool area or between unloading and the pool.
- Weather Restrictions: Installation cannot proceed in rain due to safety risks when handling heavy materials.
We require the following for reference and preparation:
- Approved pool plans – to get accurate pool dimensions in preparation for the final measure-up.
- Approved house plans – to review site details and prepare for any scaffolding requirements.
Please provide:
- House Builder Site Manager / Pre-Construction Manager – we will email all pre-handover documents prior to the Pool Void Cover® installation.
- Pool Builder Site Manager – we will email photos of the completed installation.
Yes. Please confirm if the house builder will be installing scaffolding on the Pool Void Cover®. If scaffolding is required, we will liaise with them directly to coordinate safely.
Yes. Please advise the house handover date. We will endeavour to install the Pool Void Cover® prior to handover. Note that a site inspection measure-up is required first, so we can assess site access and confirm pool dimensions before preparing the job in our workshop.
Drive up access to the pool area is preferred. To ensure a safe and efficient installation, drive up access to the pool area is preferred on the confirmed installation date.
- If drive up access is not available, a minimum charge will apply to cover additional labour and time.
- It is the responsibility of the account holder, homeowner, or Site Manager to ensure access is clear and to advise us of any works scheduled prior to installation that may impact access, such as drainage, slab installation, piling, or deliveries (e.g., frames, soil, or aggregate).
If access is blocked or unsafe on the scheduled installation day, the job may need to be rescheduled, which could result in delays.
Yes. The quoted price may change depending on factors such as:
- Site access conditions – if access is restricted or requires additional labour, a charge may apply.
- Pool size differences – if the actual pool dimensions differ from the plans provided, the quote may need adjustment.
- Pool Void Cover® rating – after reviewing your plans, we may determine that the cover’s rating needs to be upgraded (for example, from a 220kg TWP to a 225kg SWL and 225kg SWL to 450kg SWL) to meet safety and scaffolding requirements.
- Additional pool features – if the pool has features such as a feature wall, raised spa, infinity edge, or other elements that were not advised at the quote stage, the quote may need to be revised to accommodate these changes.
- Coping different heights – if the pool coping is of different heights, the quote may need to be revised to accommodate these changes.
Full payment must be made and cleared prior to the installation date to secure and lock in your booking. Installation cannot proceed until payment has been received.
Yes. Installation cannot proceed in rain or unsafe conditions due to the handling of heavy materials. If poor weather occurs on the scheduled day, the installation may need to be rescheduled.
Yes. The bond beam is the concrete poured around the fibreglass pool shell. It must be fully poured and cured prior to installation of the Pool Void Cover®.
We prefer the formwork to be removed before the Pool Void Cover® installation. Formwork are the wooden supports used to shape the concrete around the pool. If the formwork is still in place, and impedes the cover installation, we can cut and remove it as required.
We prefer the pool to be backfilled prior to installation. Pool backfill is the process of filling the excavation space around the pool.
Yes. If the industrial mesh fence is locked, we must be provided with the gate code to access the site.
Please provide clear instructions for locating the property. If the site is not easily identifiable or cannot be found on Google Maps, include nearby street names, landmarks, or notable features to help our team find the correct location. If the site is part of a large development, please also specify the correct block and address, or provide a street number if one has been assigned.
Yes, we often install Pool Void Covers® prior to the house being demolished.
On site measure up we will review site access and if there are any issues.
No. It is unsafe to install during demolition. The installation will need to be rescheduled until after demolition is complete and the site has been levelled.
See below examples site conditions of a site in middle of a demoltion:

The pool will be put into sleeper mode, which means no chemicals are added to the water until the Pool Void Cover® is removed. Once the cover has been uplifted, you can perform a shock treatment to clean the water, which will typically clear the pool within 24–48 hours.
We advise against using Hydrochloric Acid while the Pool Void Cover® is installed. It may be corrosive to the cover and could affect the validation of your engineering certificate and insurance.
No, we recommend you do not use any acid when the pool is in sleeper mode.
We recommend using paver/tile protectors. These were offered as an optional service on your quote; if not, please advise our quoting team.
- The protectors are polycarbonate sheets that minimise the risk of scratches, marks, or staining on your existing pavers and tiles.
- The tiles will naturally stain at different rates when they are covered for 12 months, compared to tiles left open to the sun.
- Please note that moisture and debris may collect under the clear protective sheet.
- After removal, we recommend a professional clean or pressure wash of the pavers/tiles along the waterline.
- If the Pool Void Cover® will have scaffolding installed on top of the cover, then we will need to lock the cover down to the tiles.
- We will discuss this process with you before installation.
- If drilling is required, there will be an 8mm diameter hole left after the cover is removed. These can be filled with grout, coloured to match the pavers.
Frequently asked Questions after Quote is Accepted
자주 묻는 질문
All Your Site Access Questions Answered
Frequently asked Questions For Site Access
Yes. The quoted price assumes unimpeded 4WD access directly to the pool area for installation of the Pool Void Cover®.
See examples of drive up access:


If drive up access is not available, please notify us before accepting the quotation. A one off additional charge may apply to cover the extra labour and time required to transport tools and equipment from the site entrance to the pool area.
If access is blocked by vehicles or machinery on the day of installation, this will be deemed no drive up access and additional charges will apply.
See below examples:


A terraced site is considered no drive up access and will require additional labour and costs.
See below examples:

We do not drive on slabs or finished surfaces. Our team will park as close as possible and carry all materials and equipment in manually. This situation is considered no drive up access and may incur additional charges.
See below example:

If we cannot drive directly to the pool area and must transport equipment manually, this is considered no drive up access.
See below example:

Potentially, if a neighbouring block is vacant and accessible, it may be used for drive up access.
See below example:

Yes, however they must keep the unloading area and pool area clear on the day of installation.
No. Deliveries must be scheduled at a different time to ensure clear and safe access for our installation team.



If slab works are underway, we will wait until the slab has been poured and properly cured before attending site to carry out the installation. This ensures the slab is not damaged and access is safe.
See below example of slab works in progress:



If the site is too wet, we may have to reschedule the installation.
See below examples:

Site works should only be carried out after the Pool Void Cover® system has been installed. This includes:
Drainage
Piling
Pier work
Terrace site cuts
See below examples:

자신있게 결정하세요
종합 FAQ
일반적인 질문에 대한 포괄적인 답변을 찾아 주거용 및 상업용 수영장 프로젝트에 대해 정보에 입각한 결정을 내릴 수 있도록 하세요. 안전하고 효율적인 수영장 솔루션을 향한 여정은 여기에서 시작됩니다.
100% 정확함 보장 이양 주택 건설업자와 현장 관리자를 위한 것입니다.
당사의 시스템은 엔지니어 설계 등급 시스템이며 양식 15 엔지니어링 인증서*, 전체 엔지니어링 문서, 보험 인증서 및 책임 사본을 현장 관리자/안전 담당자에게 제공합니다.
우리는 현장 안전 양식 및 규정 준수 문서를 포함한 모든 입회 요구 사항을 완료합니다.
(*) – 귀하의 주택 건축업자는 귀하에게 Form 15 엔지니어링 인증서를 요청할 것입니다. 여기에는 시스템 엔지니어링 설계 사양이 포함됩니다. 소매업체(예: Bunnings!!)에서 제공하는 Form 15 제조 인증서를 제공하는 공급업체에 대해 알아보세요. 이는 주택 건설 현장 관리자/안전 담당자가 허용하지 않습니다.
호주산
모든 제조는 호주에서 이루어지므로 완제품은 엄격한 호주 표준을 준수합니다.
품질 관리
모든 제품은 엄격한 품질 관리 프로세스에 따라 배송 전에 품질 검사 및 점검을 거칩니다.
호주 표준 준수
공급망 모니터링, 내부 제조 점검, 자재 점검 및 전체 추적 시스템을 활용하여 제조된 모든 Pool Void Covers®가 호주 표준을 충족하고 초과하는지 확인합니다.
엔지니어 설계
공급망을 통한 모든 재료는 재료 등급 등급 및 구조 사양을 포함하여 인증된 엔지니어링 권장 사항에 따라 공급됩니다.
우리의 일
슬라이더를 끌어 Pool Void Covers® 시스템을 확인하세요.
적절한 가격
품질 저하 없이 예산 친화적이고 합리적인 가격.
전문가팀
숙련되고 지식이 풍부한 팀으로 전문적이고 효율적인 서비스를 보장합니다.
어떤 수영장에도 적합
우리는 모든 수영장 크기에 맞는 고품질 펜싱의 방대한 재고를 제공합니다.
100% 품질
100% 품질을 보장하며 우수성이나 안전성에는 타협이 없습니다.
우리의 서비스
수영장 업계의 주거용 및 상업용 건축 요구 사항을 모두 충족하도록 설계된 전문 임대 장비를 제공하는 Safe Pool Solutions에 오신 것을 환영합니다. 우리의 고객 기반은 수영장 소유자, 수영장 건축업자, 주택 건축업자 및 개발자에 걸쳐 있습니다. Safe Pool Solutions는 수영장 업계 내 고객의 고유한 요구 사항을 충족하는 맞춤형 렌탈 서비스를 제공하는 데 자부심을 갖고 있습니다.
당사의 포괄적인 렌탈 서비스에는 Pool Void Covers®, 의회 규정을 준수하는 임시 수영장 울타리 및 게이트, 산업용 메쉬 울타리 및 고효율 탈수 펌프가 포함됩니다. 건설 중 수영장 주변의 안전 조치를 강화하거나, 건설 프로젝트를 감독하거나, 특정 수영장 관련 필수 사항을 해결하려는 경우 Safe Pool Solutions는 신뢰할 수 있는 파트너입니다.
수영장 경험을 향상시키고 역동적인 수영장 산업의 변화하는 요구 사항을 해결하기 위해 세심하게 제작된 최고 품질의 호주산 렌탈 장비의 편리함을 알아보세요.
Pool Void Covers®
주택 건물/현장 요구 사항에 따라 3가지 시스템 중에서 선택하세요.
- 레벨 1 – 이동 가능한 작업 플랫폼 – 220kg SWL.
- 레벨 2 – 비계 정격 덮개 – 225kg SWL
- 레벨 3 – 비계 정격 피복 – 450kg SWL
연락을 유지하다
문의하기
이메일을 보내주세요
전화주세요
1300 723 376
SMS Us
0403 786 266
본점
Brisbane, QLD
서비스
Brisbane, Sydney & Melbourne