FAQs - Quote Accepted

Once your quote has been accepted, understanding the next steps is essential for a smooth and efficient installation of your Pool Void Cover®. Our FAQs provide clear guidance on what we need from you, including approved pool and house plans, site contact details and information about scaffolding or site access.

We cover common questions about preparing your site, coordinating with builders, confirming handover dates, and ensuring drive up access to the pool area. By reviewing these details, you’ll know exactly what to provide and how to prepare your site for a safe and efficient installation.

At Safe Pool Solutions, we are committed to transparency and ensuring our clients are fully informed. Following these steps will help you make confident, well-informed decisions and ensure a trouble-free installation process.

经常问的问题

Next Steps After Your Quote is Accepted

Once your quote is accepted, the following timeline and requirements apply:

  • Site Inspection:
    • Existing Pools: Arranged within 7 days of quote acceptance
    • New Pools: Arranged within 7 days of pool completion
    • Urgent Jobs: Exceptions may be made
  • Follow Up: Any issues or queries from the site inspection are actioned within 1 business day.
  • Job Preparation: Please allow upto 2 business days from site measure up to installation for planning and operations.
  • Payment: Full cleared payment is required at least 7 business days before installation.
  • Day of Installation Requirements:
    • Drive up access for 4WD vehicle and if required, a trailer.
    • Clear access from unloading point to pool area.
    • No other trades working in the pool area or between unloading and the pool.
  • Weather Restrictions: Installation cannot proceed in rain due to safety risks when handling heavy materials.

We require the following for reference and preparation:

  • Approved pool plans – to get accurate pool dimensions in preparation for the final measure-up.
  • Approved house plans – to review site details and prepare for any scaffolding requirements.

Please provide:

  • House Builder Site Manager / Pre-Construction Manager  – we will email all pre-handover documents prior to the Pool Void Cover® installation.
  • Pool Builder Site Manager – we will email photos of the completed installation.

Yes. Please confirm if the house builder will be installing scaffolding on the Pool Void Cover®. If scaffolding is required, we will liaise with them directly to coordinate safely.

Yes. Please advise the house handover date. We will endeavour to install the Pool Void Cover® prior to handover. Note that a site inspection measure-up is required first, so we can assess site access and confirm pool dimensions before preparing the job in our workshop.

Drive up access to the pool area is preferred. To ensure a safe and efficient installation, drive up access to the pool area is preferred on the confirmed installation date.

  • If drive up access is not available, a minimum charge will apply to cover additional labour and time.
  • It is the responsibility of the account holder, homeowner, or Site Manager to ensure access is clear and to advise us of any works scheduled prior to installation that may impact access, such as drainage, slab installation, piling, or deliveries (e.g., frames, soil, or aggregate).

If access is blocked or unsafe on the scheduled installation day, the job may need to be rescheduled, which could result in delays.

Yes. The quoted price may change depending on factors such as:

  • Site access conditions – if access is restricted or requires additional labour, a charge may apply.
  • Pool size differences – if the actual pool dimensions differ from the plans provided, the quote may need adjustment.
  • Pool Void Cover® rating – after reviewing your plans, we may determine that the cover’s rating needs to be upgraded (for example, from a 220kg TWP to a 225kg SWL and 225kg SWL to 450kg SWL) to meet safety and scaffolding requirements.
  • Additional pool features – if the pool has features such as a feature wall, raised spa, infinity edge, or other elements that were not advised at the quote stage, the quote may need to be revised to accommodate these changes.
  • Coping different heights – if the pool coping is of different heights, the quote may need to be revised to accommodate these changes.

Full payment must be made and cleared prior to the installation date to secure and lock in your booking. Installation cannot proceed until payment has been received.

Yes. Installation cannot proceed in rain or unsafe conditions due to the handling of heavy materials. If poor weather occurs on the scheduled day, the installation may need to be rescheduled.

Yes. The bond beam is the concrete poured around the fibreglass pool shell. It must be fully poured and cured prior to installation of the Pool Void Cover®.

We prefer the formwork to be removed before the Pool Void Cover® installation. Formwork are the wooden supports used to shape the concrete around the pool. If the formwork is still in place, and impedes the cover installation, we can cut and remove it as required.

We prefer the pool to be backfilled prior to installation. Pool backfill is the process of filling the excavation space around the pool.

Yes. If the industrial mesh fence is locked, we must be provided with the gate code to access the site.

Please provide clear instructions for locating the property. If the site is not easily identifiable or cannot be found on Google Maps, include nearby street names, landmarks, or notable features to help our team find the correct location. If the site is part of a large development, please also specify the correct block and address, or provide a street number if one has been assigned.

Yes, we often install Pool Void Covers® prior to the house being demolished.

On site measure up we will review site access and if there are any issues.

No. It is unsafe to install during demolition. The installation will need to be rescheduled until after demolition is complete and the site has been levelled.

See below examples site conditions of a site in middle of a demoltion:

The pool will be put into sleeper mode, which means no chemicals are added to the water until the Pool Void Cover® is removed. Once the cover has been uplifted, you can perform a shock treatment to clean the water, which will typically clear the pool within 24–48 hours.

We advise against using Hydrochloric Acid while the Pool Void Cover® is installed. It may be corrosive to the cover and could affect the validation of your engineering certificate and insurance.

No, we recommend you do not use any acid when the pool is in sleeper mode.

We recommend using paver/tile protectors. These were offered as an optional service on your quote; if not, please advise our quoting team.

  • The protectors are polycarbonate sheets that minimise the risk of scratches, marks, or staining on your existing pavers and tiles.
  • The tiles will naturally stain at different rates when they are covered for 12 months, compared to tiles left open to the sun.
  • Please note that moisture and debris may collect under the clear protective sheet.
  • After removal, we recommend a professional clean or pressure wash of the pavers/tiles along the waterline.
  • If the Pool Void Cover® will have scaffolding installed on top of the cover, then we will need to lock the cover down to the tiles.
  • We will discuss this process with you before installation.
  • If drilling is required, there will be an 8mm diameter hole left after the cover is removed. These can be filled with grout, coloured to match the pavers.

Frequently asked Questions after Quote is Accepted

我们的 Pool Void Covers® 系统经过专门工程师设计,符合澳大利亚法规。用于现有或新的睡眠池。
FAQS
经常问的问题

All Your Site Access Questions Answered

Frequently asked Questions For Site Access

我们的 Pool Void Covers® 系统经过专门工程师设计,符合澳大利亚法规。用于现有或新的睡眠池。
FAQS

Yes. The quoted price assumes unimpeded 4WD access directly to the pool area for installation of the Pool Void Cover®.

See examples of drive up access:

If drive up access is not available, please notify us before accepting the quotation. A one off additional charge may apply to cover the extra labour and time required to transport tools and equipment from the site entrance to the pool area.

If access is blocked by vehicles or machinery on the day of installation, this will be deemed no drive up access and additional charges will apply.

See below examples:

A terraced site is considered no drive up access and will require additional labour and costs.

See below examples:

We do not drive on slabs or finished surfaces. Our team will park as close as possible and carry all materials and equipment in manually. This situation is considered no drive up access and may incur additional charges.

See below example:

If we cannot drive directly to the pool area and must transport equipment manually, this is considered no drive up access.

See below example:

Potentially, if a neighbouring block is vacant and accessible, it may be used for drive up access.

See below example:

Yes, however they must keep the unloading area and pool area clear on the day of installation.

No. Deliveries must be scheduled at a different time to ensure clear and safe access for our installation team.



If slab works are underway, we will wait until the slab has been poured and properly cured before attending site to carry out the installation. This ensures the slab is not damaged and access is safe.

See below example of slab works in progress:



If the site is too wet, we may have to reschedule the installation.

See below examples:

Site works should only be carried out after the Pool Void Cover® system has been installed. This includes:

  • Drainage

  • Piling

  • Pier work

  • Terrace site cuts

See below examples:

PVC-Logo-3

100%保证正确 交出 适用于房屋建筑商和工地管理者。

我们的系统是工程师设计评级系统 - 我们向您的现场经理/安全官员提供 Form 15 工程证书*、完整的工程文件、保险证书和责任副本。

我们完成所有入职要求 - 包括现场安全表格和合规文件。

(*) – 您的房屋建筑商将要求您提供 Form 15 工程证书 – 其中包括系统工程设计规范。请注意任何提供由零售商(例如 Bunnings!!)提供的 Form 15 制造证书的供应商。房屋建筑商现场经理/安全官员不接受这些。

澳大利亚制造

所有制造均在澳大利亚进行,确保成品符合严格的澳大利亚标准。

质量控制

所有设备在发货前均按照严格的质量控制流程进行质量检查和检查。

符合澳大利亚标准

利用供应链监控、内部制造检查、材料检查和完整的可追溯系统来确保我们制造的所有 Pool Void Covers® 符合并超过所需的澳大利亚标准。

工程师设计

供应链中的所有材料均根据经过认证的工程建议采购,包括材料等级和结构规格。

我们的工作

拖动滑块查看我们的 Pool Void Covers® 系统

img img
img img
img img
我们的流程

临时泳池围栏租赁的简单步骤

请求报价

索取报价并轻松启动您的泳池安全之旅。我们的团队随时准备为您提供帮助!

我们的团队到达

我们的专业团队会及时到达,高效安装您的临时泳池围栏,确保安装过程顺利。

解决您的泳池安全需求

灵活选择适合您需求的理想租期,无论是短期还是长期。

可接受的价格

预算友好,价格实惠,但不影响质量。

专家团队

技术精湛、知识渊博的团队,确保专业、高效的服务。

适合任何泳池

我们提供大量优质围栏库存,适合各种泳池尺寸。

100% 品质

确保 100% 质量,在卓越性或安全性上绝不妥协。

选择临时泳池围栏租赁,安全、合规且方便。我们的泳池围栏符合法规,提供快速交货和灵活的租赁。

我们的服务

欢迎来到 Safe Pool Solutions,这是您专业租赁设备的首选来源,旨在满足泳池行业住宅和商业建筑的需求。我们的客户群涵盖泳池业主、泳池建造商、房屋建筑商和开发商。在 Safe Pool Solutions,我们以提供定制租赁服务来满足泳池行业客户的独特需求而感到自豪。

我们提供全面的租赁服务,包括 Pool Void Covers®、符合议会标准的临时泳池围栏和大门、工业网围栏和高效脱水泵。无论您是想在施工期间加强泳池区域周围的安全措施、监督施工项目,还是解决与泳池相关的特定需求,Safe Pool Solutions 都是您值得信赖的合作伙伴。 

探索优质澳大利亚制造的租赁设备的便利性,这些设备经过精心设计,可增强您的泳池体验并满足动态泳池行业不断变化的需求。

Pool Void Covers®

根据您的房屋建筑/场地要求,从 3 种不同的系统中进行选择。

  • 1 级 – 可通行工作平台 – 220 公斤 SWL。
  • 2 级 – 脚手架额定覆盖物 – 225 公斤 SWL
  • 3 级 – 脚手架额定覆盖物 – 450kg SWL

1.2m泳池围栏及大门

我们的 1.2m 临时泳池围栏和大门符合 AS1926.1 2012 澳大利亚泳池围栏标准,确保合规性、耐用性和易于维护。

工业护栏网

我们的工业网围栏采用优质镀锌钢制成,确保耐用性并符合澳大利亚的高质量标准。
保持联系

联系我们

给我们发电子邮件

[email protected]

致电我们

1300 723 376

SMS Us

0403 786 266

总公司

Brisbane, QLD

维修

Brisbane, Sydney & Melbourne

zh_CN